Tel: +86-371-65621392 | Mail: chris@concretebatchplant24.com‍

Mixer For Precast Concrete

The mixer for precast concrete with twin shaft structure are welcomed on the market for high mixing efficiency and quality. The mixing productivity of precast concrete mixer is about 0.5-4.0 cubic meter, which models are JS500, JS750, JS1000, JS1500, JS2000, JS3000 and JS4000. So the users can choose suitable model of concrete mixer according to the actual needs.
mixer for precast concrete
 

The above is an introduction about the model of the mixer for precast concrete, the following is an introduction to the operation precautions of the precast concrete mixer:
1, The concrete mixer should not be stopped when it is fully loaded and mixed. When a fault or power failure occurs, the power supply should be cut off immediately, and the switch box should be locked with a warning sign "During maintenance, it is strictly prohibited to close the switch”, clear the concrete in the mixing drum, and then eliminate the fault. Or wait for the power to recover.
2, Each part of the unit should be started gradually. After starting, the operation of each component and the indication of each instrument should be normal before operation can be started.
3, During operation, it is strictly forbidden to enter the material storage area and under the lifting bucket.
4, When the concrete mixer machine is running, it is strictly forbidden to put your hands and feet into the hopper or mixing drum.
5, The machinery of the precast concrete mixer should not be overloaded; the operation of the motor should be checked. When the running sound is found to be abnormal or the temperature rise is too high, it should be shut down immediately for inspection; the forced operation is not allowed when the voltage is too low.
6, Before stopping the concrete mixer, unload it first, and then turn off the switches and pipelines in order. All the cement in the spiral pipe should be transported out, and no material should remain in the pipe
7. After operation, the mixing drum, discharge door and discharge hopper of mixer for precast concrete should be cleaned and rinsed with water. The knife holders and knives of the weighing system should be cleaned and the weighing accuracy should be ensured.

Inquiry

(Please write down the product model or any requirement)
E-mail:
Message:
 

Contact Information

E-mail:chris@concretebatchplant24.com‍
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China

Sitemap
Home
Products
Cases
About Haomei
Service
Contacts
All Products
Mobile Concrete Plant
Conrete Batching Plant
Concrete Pump
Concrete Mixer Truck
Concrete Mixer
Concrete Batching Plants
Hot Sale
Yhzs60 mobile batching plant
Yhzs75 mobile batching plant
hzs75 concrete batching plant
hzs180 concrete batching plant
HM6-D Concrete Mixer Truck
Other link
Facebook
Youtube
Linkedin

Copyright © 2013 - All Rights Reserved - HaomeiMachinery.com